之前,如果没有 ?> 就直接放最后)===== // 1) Google Search Console 验证标签 add_action( 'wp_head', function () { echo '' . "\n"; }, 1 ); // 2) 匿名访问的 HTML 加 CDN 缓存头(浏览器不缓存,CDN 缓存 1 小时) add_filter( 'wp_headers', function ( $headers ) { if ( is_admin() || is_user_logged_in() ) { return $headers; } $headers['Cache-Control'] = 'public, max-age=0, s-maxage=3600, stale-while-revalidate=86400'; return $headers; }, 20 ); // ===== 粘贴结束 ===== CNC Machining in China | Sourcing Without Surprises | Hanz

Dongguan, Guangdong, China · ISO 9001 quality system

China sourcing

Sourcing CNC parts from China without the surprises

How to source CNC machined and die cast parts from China without the usual surprises: supplier vetting, IP, inspection, Incoterms and communication.

  • ISO 9001 quality system
  • Quotes within hours
  • Prototype to production

Overview

The opportunity and the risk

China has a deep machining and tooling supply chain, and for many precision parts the landed cost is lower than domestic alternatives. The risk is not that Chinese shops cannot machine well. The risk is choosing the wrong shop, sending an incomplete RFQ, or discovering a quality problem after the parts are on the water.

This page explains how we reduce that risk, and when sourcing offshore is the wrong decision. For the full buyer’s checklist, read the sourcing guide.

  • Stable drawing and revision
  • Repeatable volume
  • Freight and duty modeled
  • Inspection plan agreed
  • English communication
  • IP protection addressed

Risk control

Common risks and how we handle them

RiskWhat goes wrongHow we reduce it
Unclear drawingPart meets the model but not the functionDrawing review and DFM notes before quoting
Material substitutionWrong alloy or conditionMaterial certificate and grade confirmation
Tolerance driftFirst parts pass, later parts do notFirst article plus in-process checks
Finishing damageThreads coated, bores reducedMasking plan and post-finish checks
Shipping surpriseDuty, delay or damageIncoterm agreed, packing and documents checked
IP exposureDesign shared too widelyNDA, limited access, tooling ownership in writing

Process

A first order that works

Build the RFQ

Drawing, model, material, finish, quantity, destination and date.

Review and quote

We confirm the process, assumptions and lead time in writing.

Approve the sample

First article report and photos before the batch continues.

Inspect and ship

Final report, packing photos and the agreed Incoterm.

Honest advice

When sourcing from China is the wrong choice

If you need one urgent replacement part, if the design is still changing weekly, or if the landed cost after freight, duty and inventory is close to the domestic price, stay local.

We would rather say that than win an order that disappoints you. The same honesty applies to process choice: if another process is cheaper for your volume, we will say so.

FAQ

Questions buyers ask before the first order

How do I protect my design?

Sign an NDA before sending files, ask who will see them, and put tooling ownership in writing. No document replaces diligence, but these steps reduce exposure.

Can I inspect before paying the balance?

That is a reasonable request and can be agreed in the order. We can provide photos, reports or a third-party inspection.

What Incoterm do you recommend?

FOB if you have a forwarder; DDP if you want one delivered price. We quote what fits your process and explain the difference.

How long does a first order take?

Machined parts often ship in two to four weeks after drawing approval, plus transit. Die casting adds tooling time.

Start a project

Send your drawings. Get a quote in hours.

Upload CAD files or send a sketch with material, quantity and finish. Our engineers reply with pricing, DFM notes and a lead time, usually within one business day.

Request a quote Email engineering

Typical reply: within 1 business day

Call Get a quote