之前,如果没有 ?> 就直接放最后)===== // 1) Google Search Console 验证标签 add_action( 'wp_head', function () { echo '' . "\n"; }, 1 ); // 2) 匿名访问的 HTML 加 CDN 缓存头(浏览器不缓存,CDN 缓存 1 小时) add_filter( 'wp_headers', function ( $headers ) { if ( is_admin() || is_user_logged_in() ) { return $headers; } $headers['Cache-Control'] = 'public, max-age=0, s-maxage=3600, stale-while-revalidate=86400'; return $headers; }, 20 ); // ===== 粘贴结束 ===== Inspection & Documentation | First Article & Reports | Hanz

Dongguan, Guangdong, China · ISO 9001 quality system

Inspection

Inspection and documentation, planned with the job

How inspection works at Hanz: drawing review, first article, in-process checks, final dimensional reports, material certificates and nonconformance handling.

  • ISO 9001 quality system
  • Quotes within hours
  • Prototype to production

Approach

Inspection is a plan, not a final step

The inspection report is only as good as the plan behind it. We review the drawing, agree which dimensions control fit and function, and decide how each one will be measured before production starts.

That plan covers the features that can drift: bore sizes, hole positions, flatness, runout and thread quality. Cosmetic and functional surfaces are treated differently, because they fail for different reasons.

  • Drawing and datum review
  • Critical features identified
  • Measurement method agreed
  • First article inspection
  • In-process checks
  • Final dimensional report

Process

How a batch is checked

Before machining

Material grade and condition are checked against the certificate and the drawing.

First article

The first part is measured and documented before the batch continues.

In process

Critical dimensions are checked as the batch runs, not only at the end.

Final inspection

Parts are checked, counted and packed with the agreed documentation.

Release

Photos, reports and certificates are sent before or with the shipment.

Paperwork

Documentation options

DocumentWhen it is usefulWhat it contains
Dimensional reportEvery production orderThe features agreed at quoting, with measured values
First article reportNew parts and revisionsFull drawing check before the batch
Material certificateWhen traceability mattersMill certificate for the purchased material
Certificate of conformanceCustomer quality systemsStatement that the parts meet the purchase order
PhotosBefore shipmentPacking, labels and key features
Nonconformance reportIf something goes wrongCause, containment and corrective action

Scope

What we do not claim

We operate an ISO 9001 quality management system. We do not claim IATF 16949 or ISO 13485 certification. If your program requires a specific quality system or a specific test (X-ray, leak, salt spray), tell us at quoting and we will confirm what can be supported, in-house or through a qualified partner.

A report is not a substitute for a drawing that defines what matters. If a callout is ambiguous, we ask before production.

Sample reports are available on request. Customer names and part numbers are redacted.

FAQ

Questions buyers ask before the first order

Can you provide a first article inspection report?

Yes. Ask for it at quoting so the inspection plan and the report format are agreed before production.

Do you use a CMM?

Inspection method depends on the feature. Tell us the callouts and we will confirm the method, whether that is a hand tool, a gauge or a coordinate measurement.

What happens if a dimension is out?

We inform you, contain the affected parts and agree rework or replacement before shipping. The cause is corrected before the next run.

Start a project

Send your drawings. Get a quote in hours.

Upload CAD files or send a sketch with material, quantity and finish. Our engineers reply with pricing, DFM notes and a lead time, usually within one business day.

Request a quote Email engineering

Typical reply: within 1 business day

Call Get a quote