之前,如果没有 ?> 就直接放最后)===== // 1) Google Search Console 验证标签 add_action( 'wp_head', function () { echo '' . "\n"; }, 1 ); // 2) 匿名访问的 HTML 加 CDN 缓存头(浏览器不缓存,CDN 缓存 1 小时) add_filter( 'wp_headers', function ( $headers ) { if ( is_admin() || is_user_logged_in() ) { return $headers; } $headers['Cache-Control'] = 'public, max-age=0, s-maxage=3600, stale-while-revalidate=86400'; return $headers; }, 20 ); // ===== 粘贴结束 ===== FAQ | CNC Machining and Die Casting | Hanz Manufacturing

Dongguan, Guangdong, China · ISO 9001 quality system

FAQ

Questions buyers ask before the first order

Answers to the questions buyers ask before the first order: MOQ, quote time, files, tolerances, materials, finishing, shipping, payment and IP.

  • ISO 9001 quality system
  • Quotes within hours
  • Prototype to production

Overview

The short answers, in one place

If your question is not here, send it with the drawing. A specific answer is more useful than a general page, and it usually takes less than a business day.

For pricing, start with the quote page; for process fit, see capabilities; for shipping terms, see shipping and logistics.

Ask better

How to get a specific answer

If the question is about your part, include the drawing, the material, the quantity and the finish. If it is about an order already placed, include the PO number and the part number so we can look up the job instead of guessing.

A specific question usually gets a specific answer the same day. A general question often gets a general answer, which is less useful to your project.

  • Attach the drawing or model
  • State material and quantity
  • Name the critical dimensions
  • Tell us the destination and date
  • Include the PO for existing orders
  • Mark cosmetic surfaces

FAQ

Questions buyers ask before the first order

What is the minimum order quantity?

One part. There is no fixed minimum and no published monthly capacity ceiling. Unit price improves with quantity, and we will tell you when a different process is cheaper.

Do you have size or capacity limits?

We do not publish a hard size or volume cap. If a part exceeds our own machine envelope, we quote it through a qualified partner and keep inspection and shipping with us.

How fast can I get a quote?

Most machining quotes are returned within one business day. Die casting projects with new tooling usually take two to three days because the mold concept has to be priced.

What files should I send?

STEP or IGES for 3D geometry, and a PDF or DXF drawing with tolerances, material, finish and quantity. A sketch is enough for an early estimate.

Do you sign NDAs?

Yes. Send your NDA before the drawings and we will sign it before reviewing the files. We do not reuse customer designs or tooling for other customers.

Can you work from a 2D drawing only?

Yes, for many parts. A dimensioned drawing with tolerances is enough. Complex surfaces and multi-face features are better with a 3D model.

What tolerances can you hold?

It depends on the feature, material and process. Send the callouts you actually need and we will confirm capability before quoting.

Do you offer prototypes?

Yes. Simple aluminum parts can sometimes ship in one day; typical prototypes take three to five working days depending on complexity and finish.

What materials do you machine?

Aluminum 6061 and 7075, 303/304/316 stainless, titanium Grade 5, brass C360, cold rolled steel and engineering plastics such as POM, ABS and PEEK.

Do you cast aluminum in-house?

We quote die casting with tooling and secondary machining as one project. Tell us the annual volume and the machined faces so the tooling and piece price can be evaluated together.

Can you anodize or powder coat parts?

Yes. Anodizing, powder coating, passivation, bead blasting, laser marking and light assembly can be included on the same order.

What is the typical lead time?

Machined prototypes often ship in days; production orders typically take two to four weeks after approval, depending on material, finishing and quantity. Casting adds tooling time.

How do you ship?

Samples usually move by DHL, FedEx or UPS. Production volumes ship by air, sea or rail. DDP can be quoted on request.

What are your payment terms?

Terms are confirmed on the quotation. They depend on the order value, the customer history and whether tooling is involved.

Who owns the tooling?

Tooling ownership is agreed in writing before the mold is built. Tell us your requirement at quoting so it is included in the terms.

Can I approve a sample before production?

Yes. First article inspection is available on request, and we can send photos and dimensional data before the batch continues.

Do you provide material certificates?

Yes, for material we purchase. Customer-supplied material is recorded as received.

What if parts are out of tolerance?

We inform you, contain the affected parts, investigate the cause and agree on rework or replacement before shipping.

Can I visit the factory?

Yes, by appointment. We are in Dongguan, about an hour from Shenzhen Bao'an airport. Video walkthroughs are available if travel is not practical.

Do you speak English?

Yes. Quotes, DFM notes and production updates are in English, usually within one business day.

How do you protect my design?

NDA before review, no reuse of customer tooling, and no public display of customer part numbers or drawings without permission.

Start a project

Send your drawings. Get a quote in hours.

Upload CAD files or send a sketch with material, quantity and finish. Our engineers reply with pricing, DFM notes and a lead time, usually within one business day.

Request a quote Email engineering

Typical reply: within 1 business day

Call Get a quote