之前,如果没有 ?> 就直接放最后)===== // 1) Google Search Console 验证标签 add_action( 'wp_head', function () { echo '' . "\n"; }, 1 ); // 2) 匿名访问的 HTML 加 CDN 缓存头(浏览器不缓存,CDN 缓存 1 小时) add_filter( 'wp_headers', function ( $headers ) { if ( is_admin() || is_user_logged_in() ) { return $headers; } $headers['Cache-Control'] = 'public, max-age=0, s-maxage=3600, stale-while-revalidate=86400'; return $headers; }, 20 ); // ===== 粘贴结束 ===== Sourcing CNC Machined Parts from China: A Buyer’s Guide

Dongguan, Guangdong, China · ISO 9001 quality system

Guide

Sourcing machined parts from China without the surprises

How to source machined parts from China without surprises: vetting suppliers, RFQ packs, IP protection, Incoterms, quality inspection and red flags.

  • ISO 9001 quality system
  • Quotes within hours
  • Prototype to production

Overview

The opportunity and the risk

China has a deep machining and tooling supply chain, and for many precision parts the landed cost is lower than domestic alternatives. The risk is not that Chinese shops cannot machine well. The risk is choosing the wrong shop, sending an incomplete RFQ, or discovering a quality problem after the parts are on the water.

This guide is about reducing that risk. It is also about knowing when sourcing offshore is the wrong decision.

Decision

When sourcing from China makes sense

It makes sense when the part is stable, the drawing is clear, the volume is repeatable and you can inspect or trust the inspection. It makes less sense for one urgent replacement part, for a design that is still changing weekly, or when the total landed cost after freight, duty and inventory is close to the domestic price.

Run the total landed cost, not the unit price. Freight, duty, payment fees, inspection and the cost of your time all belong in the comparison.

  • Stable drawing and revision
  • Repeatable volume
  • Freight and duty modeled
  • Inspection plan agreed
  • Supplier can communicate in English
  • IP protection addressed

Process

The sourcing process that works

Build the RFQ pack

Drawing, 3D model, material, finish, quantity, target date, inspection and documentation requirements.

Vet the supplier

Check process fit, quality system, references and communication. Ask for similar parts, not just a brochure.

Quote and DFM

Compare process route and assumptions, not only the number. A cheap quote with the wrong process is not cheap.

First article

Approve a sample with a dimensional report before production.

Inspect and ship

Final inspection, packing photos and the agreed Incoterm before the goods leave.

RFQ

What belongs in the RFQ pack

The RFQ is the cheapest place to prevent a quality problem. If the drawing does not state the material grade, the thread class, the finish standard and the surfaces that matter, the supplier will fill the gaps with assumptions.

Include the quantity and the annual forecast. Include the destination so freight can be quoted. Include any documentation your quality team needs, and say whether the part is cosmetic.

  • 2D drawing with tolerances
  • 3D model (STEP/IGES)
  • Material grade and temper
  • Finish and color
  • Quantity and annual volume
  • Required date and destination
  • Inspection and documentation
  • NDA if confidential

IP

Protecting your design

Send an NDA before the drawings if the design is sensitive. Ask who will see the files, whether the supplier uses subcontractors, and who owns the tooling. For molds and fixtures, put ownership in writing and mark the tool.

No NDA stops copying by itself. The practical protections are a supplier with a reputation to lose, a relationship worth more than the part, and a design that is hard to copy without the process knowledge.

Quality

Quality: trust but verify

Ask for a first article inspection report and check the dimensions yourself if you can. For production, agree the inspection plan, the sampling and the report format. Third-party inspection is available in the Pearl River Delta and is a reasonable cost for a first order.

If a supplier resists inspection or cannot explain how a feature will be measured, that is information.

Commercial

Incoterms, payment and shipping

EXW means you handle everything from the factory door. FOB puts the goods on the vessel and splits the cost at that point. CIF includes freight and insurance to your port. DDP means the supplier delivers to your door with duty paid, which is convenient but usually carries a margin.

Payment terms vary. A common structure is a deposit with the balance before shipment. Paying 100% upfront to a new supplier is a risk; so is expecting open credit on the first order.

  • EXW, FOB, CIF or DDP agreed in writing
  • Freight and duty included in landed cost
  • Deposit and balance terms
  • Inspection before balance payment
  • Packing and labeling requirements
  • Insurance for high-value shipments

Logistics

Typical shipping options

MethodTransit timeBest for
Express (DHL/FedEx/UPS)A few daysSamples and urgent small batches
Air freightAbout a weekMedium batches where speed matters
Sea freightWeeksVolume where cost matters more than time
RailWeeks, often faster than seaEurope-bound volume

Red flags

Red flags worth walking away from

A price far below everyone else usually means a different material, a skipped operation or a process that cannot hold the tolerance. Vague answers about the process, no inspection capability and pressure to pay the full amount upfront are all reasons to slow down.

A good supplier will ask questions. A supplier that quotes without reading the drawing is telling you something.

  • Price far below the market
  • No questions about the drawing
  • No inspection report available
  • Reluctance to sign an NDA
  • Full payment requested upfront
  • No process explanation
  • Pressure to skip the sample

FAQ

Questions buyers ask before the first order

How much cheaper are machined parts from China?

It varies by part and volume. After freight, duty and inspection, many parts land meaningfully below Western pricing, but some do not once logistics and inventory are counted. Always compare landed cost, not the quoted unit price.

How do I protect my design?

Sign an NDA, ask about subcontracting, keep tooling ownership in writing, and work with a supplier whose reputation matters. No legal document replaces diligence.

What Incoterm should I use?

FOB is common for buyers who have a freight forwarder. DDP is simpler but usually more expensive. Agree the term in writing before the order.

Can I inspect before paying the balance?

That is a reasonable request and many suppliers accept it. Agree the inspection method and the release criteria in the order.

How long does a first order take?

Machined parts often ship in two to four weeks after drawing approval, plus transit. Die casting adds tooling time, typically several weeks depending on complexity.

Start a project

Send your drawings. Get a quote in hours.

Upload CAD files or send a sketch with material, quantity and finish. Our engineers reply with pricing, DFM notes and a lead time, usually within one business day.

Request a quote Email engineering

Typical reply: within 1 business day

Call Get a quote