Overview
The opportunity and the risk
China has a deep machining and tooling supply chain, and for many precision parts the landed cost is lower than domestic alternatives. The risk is not that Chinese shops cannot machine well. The risk is choosing the wrong shop, sending an incomplete RFQ, or discovering a quality problem after the parts are on the water.
This guide is about reducing that risk. It is also about knowing when sourcing offshore is the wrong decision.
Decision
When sourcing from China makes sense
It makes sense when the part is stable, the drawing is clear, the volume is repeatable and you can inspect or trust the inspection. It makes less sense for one urgent replacement part, for a design that is still changing weekly, or when the total landed cost after freight, duty and inventory is close to the domestic price.
Run the total landed cost, not the unit price. Freight, duty, payment fees, inspection and the cost of your time all belong in the comparison.
- Stable drawing and revision
- Repeatable volume
- Freight and duty modeled
- Inspection plan agreed
- Supplier can communicate in English
- IP protection addressed
Process
The sourcing process that works
Build the RFQ pack
Drawing, 3D model, material, finish, quantity, target date, inspection and documentation requirements.
Vet the supplier
Check process fit, quality system, references and communication. Ask for similar parts, not just a brochure.
Quote and DFM
Compare process route and assumptions, not only the number. A cheap quote with the wrong process is not cheap.
First article
Approve a sample with a dimensional report before production.
Inspect and ship
Final inspection, packing photos and the agreed Incoterm before the goods leave.
RFQ
What belongs in the RFQ pack
The RFQ is the cheapest place to prevent a quality problem. If the drawing does not state the material grade, the thread class, the finish standard and the surfaces that matter, the supplier will fill the gaps with assumptions.
Include the quantity and the annual forecast. Include the destination so freight can be quoted. Include any documentation your quality team needs, and say whether the part is cosmetic.
- 2D drawing with tolerances
- 3D model (STEP/IGES)
- Material grade and temper
- Finish and color
- Quantity and annual volume
- Required date and destination
- Inspection and documentation
- NDA if confidential
IP
Protecting your design
Send an NDA before the drawings if the design is sensitive. Ask who will see the files, whether the supplier uses subcontractors, and who owns the tooling. For molds and fixtures, put ownership in writing and mark the tool.
No NDA stops copying by itself. The practical protections are a supplier with a reputation to lose, a relationship worth more than the part, and a design that is hard to copy without the process knowledge.
Quality
Quality: trust but verify
Ask for a first article inspection report and check the dimensions yourself if you can. For production, agree the inspection plan, the sampling and the report format. Third-party inspection is available in the Pearl River Delta and is a reasonable cost for a first order.
If a supplier resists inspection or cannot explain how a feature will be measured, that is information.
Commercial
Incoterms, payment and shipping
EXW means you handle everything from the factory door. FOB puts the goods on the vessel and splits the cost at that point. CIF includes freight and insurance to your port. DDP means the supplier delivers to your door with duty paid, which is convenient but usually carries a margin.
Payment terms vary. A common structure is a deposit with the balance before shipment. Paying 100% upfront to a new supplier is a risk; so is expecting open credit on the first order.
- EXW, FOB, CIF or DDP agreed in writing
- Freight and duty included in landed cost
- Deposit and balance terms
- Inspection before balance payment
- Packing and labeling requirements
- Insurance for high-value shipments
Logistics
Typical shipping options
| Method | Transit time | Best for |
|---|---|---|
| Express (DHL/FedEx/UPS) | A few days | Samples and urgent small batches |
| Air freight | About a week | Medium batches where speed matters |
| Sea freight | Weeks | Volume where cost matters more than time |
| Rail | Weeks, often faster than sea | Europe-bound volume |
Red flags
Red flags worth walking away from
A price far below everyone else usually means a different material, a skipped operation or a process that cannot hold the tolerance. Vague answers about the process, no inspection capability and pressure to pay the full amount upfront are all reasons to slow down.
A good supplier will ask questions. A supplier that quotes without reading the drawing is telling you something.
- Price far below the market
- No questions about the drawing
- No inspection report available
- Reluctance to sign an NDA
- Full payment requested upfront
- No process explanation
- Pressure to skip the sample