之前,如果没有 ?> 就直接放最后)===== // 1) Google Search Console 验证标签 add_action( 'wp_head', function () { echo '' . "\n"; }, 1 ); // 2) 匿名访问的 HTML 加 CDN 缓存头(浏览器不缓存,CDN 缓存 1 小时) add_filter( 'wp_headers', function ( $headers ) { if ( is_admin() || is_user_logged_in() ) { return $headers; } $headers['Cache-Control'] = 'public, max-age=0, s-maxage=3600, stale-while-revalidate=86400'; return $headers; }, 20 ); // ===== 粘贴结束 ===== CNC Machining Cost: What Drives the Price | Hanz

Dongguan, Guangdong, China · ISO 9001 quality system

Cost guide

What drives the cost of a CNC machined part

What drives the price of a CNC machined part: setup, programming, material, cycle time, finishing, inspection and freight, and how to reduce each one.

  • ISO 9001 quality system
  • Quotes within hours
  • Prototype to production

Overview

There is no single price per hour

Two parts with the same weight can differ by a factor of five. The price is built from setup, programming, material, cycle time, tolerance, finishing, inspection and freight. A quote that only states a number hides the assumptions behind it.

This guide explains the components so you can compare quotes fairly and see which design changes actually reduce cost.

Cost structure

What is in the price

ComponentWhat it coversWhat moves it
Setup and programmingFixture, tooling, CAM, first articleNumber of setups, complexity, tolerances
MaterialBar or plate, certificateAlloy, size, availability, scrap
Cycle timeMachine time per partGeometry, material, tolerance, finish
FinishingAnodizing, coating, markingType, color, masking, cosmetic requirements
InspectionFirst article, in-process, final reportCritical features, documentation, sampling
Packaging and freightProtection, documents, transportDestination, weight, speed, Incoterm

Cost drivers

The features that raise cost

Tight tolerances, deep pockets, thin walls, sharp internal corners, fine surface finishes and multiple faces all add time or risk. So does a material that work hardens or wears tools quickly.

A tolerance that is tighter than the function requires is the most common way to overpay. The second is a design that needs three setups when one would do.

  • Tolerances tighter than needed
  • Deep pockets with poor tool access
  • Thin walls that distort
  • Sharp internal corners
  • Multiple setups and re-fixturing
  • Cosmetic finishes on hidden faces
  • Rare alloys or oversized stock

Method

How we build a quote

Read the drawing

Identify datums, critical features and the finish that matters.

Choose the process

Machine, material and fixturing that fit the quantity.

Estimate cycle time

Programming, setups, cutting time and inspection.

Add finishing and freight

Finishing, packing and the agreed Incoterm.

State the assumptions

Material, quantity, tolerance and lead time, in writing.

Reduction

How to reduce cost without hurting the part

Relax tolerances that do not control fit or function. Combine features into fewer setups. Use a standard alloy and a standard stock size. Move cosmetic requirements to the faces that are actually visible. Ask for a quote at two quantities; the setup cost is spread differently.

If a part is still a concept, ask for a DFM review before the design freeze. Moving a hole or changing a corner radius is cheap on screen and expensive after the first article.

  • General tolerance plus critical callouts
  • Fewer setups
  • Standard material and stock
  • Cosmetic faces only where visible
  • Quote at two quantities
  • DFM before design freeze

Comparison

How to compare two quotes

Compare the assumptions, not just the total: material grade, quantity, finish, inspection, packing, Incoterm and lead time. A quote that excludes finishing or freight is not cheaper; it is incomplete.

Ask what would change the price. A supplier who can explain the cost drivers is easier to work with than one who only sends a number.

Any price ranges you see online are not a quote. The part, the quantity and the destination decide the number.

FAQ

Questions buyers ask before the first order

Why is my part more expensive than the last one?

Usually tolerance, setup count, material or finishing. Ask for the cost drivers in the quote; a good supplier can point to the features that moved the price.

Does quantity reduce the unit price?

Yes, because setup and programming are spread across more parts. The material and cycle time per part do not disappear, so the curve flattens.

Is a tighter tolerance always more expensive?

Not always, but often. It can require a different machine, a slower cycle, more inspection or a higher scrap risk.

Can you quote from a sketch?

Yes, with assumptions clearly stated. A dimensioned drawing or STEP file gives a more reliable number.

Start a project

Send your drawings. Get a quote in hours.

Upload CAD files or send a sketch with material, quantity and finish. Our engineers reply with pricing, DFM notes and a lead time, usually within one business day.

Request a quote Email engineering

Typical reply: within 1 business day

Call Get a quote